
Dry-lay the tiles first to minimise the number of cut tiles and to ensure the shades are harmonics.
Mark the working lines using the wall as a guide.
Apply the adhesive following the manufacturer's instructions carefully.
Lay the tiles section by section, levelling each with its neighbour.
Lay the border tiles. Remember to have a grout line between the border tiles and the wall.
For wall tiles, mark out where the fixtures (e.g. light switches, etc. ) are located.
Take note of corners and the border around windows.
Leave the tiles to set.
The setting time will vary from a few hours to a few days, depending on the type of base surface and adhesive used.
Apply the grout and do the final clean up.